Job Name: 100 East state People on the job: Az, Nate, and Logan Arrive: 8 AM Leave: 9 AM What was done: Unpacked, crawled in attic, packed up Parts used from the van: Notes: Job Name: Downstreet Mad River People on the job: Az, Nate, and Logan Arrive: 10 AM Leave: 12 PM What was done: Replaced shower valve in unit 22 Parts used from the van: 3 Sweat Couplings Notes: Job Name: Crosstown People on the job: Az, Nate, and Logan Time: About 20 min What was done: Re-did shower drain seal Parts used from the van: Notes: