Skip to content

Apr 22nd

April 22, 2026

125 Weston

People on the job: Az, Nate, Logan

Arrived: 8:00 AM

Left: 11:30 AM

What was done

  • Capped dead water lines
  • Extended some drainage
  • Re seated toilets

Parts Used from the van

  • None

Notes

  • None

Hugos

People on the job: Az, Nate, Logan

Time: Less than an hour

What was done

  • Fixed faucet

Parts Used from the van

  • None

Notes

  • None

King Rd

People on the job: Az, Nate, Logan

Arrived: 1:15 PM

Left: 2:30 PM

What was done

  • Connected hose bib
  • Figured out what needed to be done for some other hose bibs

Parts Used from the van

  • None

Notes

  • None