Skip to content

Apr 23rd

April 23, 2026

Bathhouse

People on the job: Az, Nate, Logan

Arrived: 8:00 AM

Left: 2:00 PM

What was done

  • Figured out what to do with the pool stuff
  • Insulated lines

Parts Used from the van

  • None

Notes

  • None

100 East state

People on the job: Az, Nate

Arrived: 8:45 AM

Left: 9:30 AM

What was done

  • Moved shower trap on 3rd fl bathroom

Parts Used from the van

  • None

Notes

  • None