Skip to content

Jul 10th

July 10, 2026

Walker Terrace

People on the job: Az, Nate, John

Arrived: 8:00 AM

Left: 8:45 AM

What was done

  • Added second PRV

Parts Used from the van

  • None

Notes

  • None

137 North Seminary

People on the job: Az, Nate, John

Time: 30 Min or so

What was done

  • Diagnosed gas leak

Parts Used from the van

  • None

Notes

  • None

Gould Hill

People on the job: Az, Nate, John

Arrived: 10:30 AM

Left: 11:30 AM

What was done

  • Caulked shower walls
  • Installed niche

Parts Used from the van

  • None

Notes

  • None