Jul 10th
July 10, 2026
Walker Terrace
People on the job: Az, Nate, John
Arrived: 8:00 AM
Left: 8:45 AM
What was done
- Added second PRV
Parts Used from the van
- None
Notes
- None
137 North Seminary
People on the job: Az, Nate, John
Time: 30 Min or so
What was done
- Diagnosed gas leak
Parts Used from the van
- None
Notes
- None
Gould Hill
People on the job: Az, Nate, John
Arrived: 10:30 AM
Left: 11:30 AM
What was done
- Caulked shower walls
- Installed niche
Parts Used from the van
- None
Notes
- None