Jul 8th
July 8, 2026
5 Walker Terrace
People on the job: Az, Nate, John
Time: About 45 Min
What was done
- Replaced expansion tank, prv, and fill valve
Parts Used from the van
- None
Notes
- None
23 Prospect
People on the job: Az, Nate, John
Time: About 10 Min
What was done
- Told them to not spill water on the floor
Parts Used from the van
- None
Notes
- None
2 Foster
People on the job: Az, Nate, John
Arrived: 10:15 AM
Left: 11:15 AM
What was done
- Finished up some small stuff
Parts Used from the van
- None
Notes
- None
Gould Hill
People on the job: Az, Nate, John
Arrived: 1:00 PM
Left: 3:00 PM
What was done
- Set shower pan and hung drywall
Parts Used from the van
- None
Notes
- None