Skip to content

Jul 24th

July 24, 2026

100 East State

People on the job: Az, Logan

Arrived: 8:00 AM

Left: 2:30 PM

What was done

  • Finished up some small stuff around the house
  • Tested almost all the waterlines
  • Installed second floor washer/dryer

Parts Used from the van

  • None

Notes

  • None