Skip to content

Jun 25th

June 25, 2026

145 Bliss Pond

People on the job: Az, John

Arrived: 8:00 AM

Left: 8:45 AM

What was done

  • Replaced tub drain with toe kick

Parts Used from the van

  • None

Notes

  • None

Judy Pierce

People on the job: Az, John, Dusty, Sheldon

Arrived: 9:30 AM

Left: 3:30 PM

What was done

  • Installed new hose bib
  • Bathroom remodel

Parts Used from the van

  • None

Notes

  • None