Nov 3rd
November 3, 2026
Loomis
People on the job: Az, Nate, Logan
Arrived: 8:30 AM
Left: 11:30 AM
What was done
- Moved kitchen drain
Parts Used from the van
- None
Notes
- None
Threshold
People on the job: Az, Nate, Logan
Arrived: 12:30 PM
Left: 2:00 PM
What was done
- Replaced thermostatic valves on some baseboard loops
- Fixed some shower valves
- Installed shower head on third floor shower
Parts Used from the van
- None
Notes
- None