Skip to content

Nov 3rd

November 3, 2026

Loomis

People on the job: Az, Nate, Logan

Arrived: 8:30 AM

Left: 11:30 AM

What was done

  • Moved kitchen drain

Parts Used from the van

  • None

Notes

  • None

Threshold

People on the job: Az, Nate, Logan

Arrived: 12:30 PM

Left: 2:00 PM

What was done

  • Replaced thermostatic valves on some baseboard loops
  • Fixed some shower valves
  • Installed shower head on third floor shower

Parts Used from the van

  • None

Notes

  • None